Agile->SOA->EBS Oracle PIP adapter has logic to have the default Ops Seq be 1 for -SP item’s for the BOM and then for nondash item’s be 10 Ops Seq. *
Agile->SOA->EBS
Oracle PIP adapter has logic to have the default Ops Seq be 1 for -SP item’s for the BOM and then for nondash item’s be 10 Ops Seq.
**I thought the default was suppose to be 10 for all??
**What does the PIP logic say as far as Ops seq??