I would like to do the following if possible:

  1. Quoting a Top level Part # “ABD0001”.
  2.  “ABD001” is made up of 2 separate parts (“Part001″ and Part 002”).
  3. (“Part001″ and Part 002”) ship separately at different times and needs to be assembled on site to make up for final part.
  4. How do I invoice, inventory shipping docs etc and get paid while minimizes confusion