Component Engineer for an MCO
The Agile 9.3.6 documentation states the default routing manager for an ECO is the “Change Analyst”. And the for an MCO it is the “Component Engineer”. Then why is it when we hit the [ Comment ] button on an MCO, the popup box gives us checkbox choices under “Notify:”. The checkbox shows as “[ ] Change Analyst”. Shouldn’t this say “[ ] Component Engineer” if it is an MCO (Manufacturer Order instead of a Change Order) ? With an an MCO, who actually gets notified with the comment, if we put a check in “[ x ] Change Analyst” ?