Agile->SOA->EBS Oracle PIP adapter has logic to have the default Ops Seq be 1 for -SP item’s for the BOM and then for nondash item’s be 10 Ops Seq. *

Agile->SOA->EBS

Oracle  PIP adapter has logic to have the default Ops Seq be 1 for -SP item’s for the BOM and then for nondash item’s be 10 Ops Seq.

**I thought the default was suppose to be 10 for all??

**What does the PIP logic say as far as Ops seq??

 

Agile User Asked on July 8, 2020 in Agile PLM (v9).
Add Comment
0 Answer(s)

Your Answer